Transport and site
Modified container structureAsk about original shell condition, repairs and reinforcement of openings. Container geometry and modifications need project-specific engineering; the original cargo rating does not establish building acceptance.
Volumetric moduleMore work is done before shipping. Check the transport envelope, permits for the route, and the crane lift plan.
Panelized wallsPacks can be efficient. The foundation interface and the sequence of closing the roof decide how much weather the frame sees.
Engineering choices
Standard layoutFaster to compare when your footprint fits the published module dimensions. Unusual spans still need a custom check.
Custom frameUseful for an odd clear span, a mezzanine, or a local load such as a 125 psf storage deck. Expect a longer drawing cycle and a narrower supplier list. Ask whether the primary frame is hot-rolled steel or cold-formed steel before you accept the substitution.
EnvelopeAsk whether the wall is an insulated metal panel or a built-up sheet, and what thermal transmittance is stated.
Commercial reading
Same quantityCompare module counts or building counts, not a mix of both, and keep one currency.
Same destinationA factory-gate offer and a jobsite offer are different purchases even when the floor plan matches.
Same documentsRequest the calculation basis, the coating, and the warranty text that names this configuration.