How to reach the desk
Use the form on this page. That is the channel that creates a procurement record. Do not rely on a social feed or a guessed phone number. If a drawing set is large, say so in the note and send files after the first reply.
Buyer brief desk
Send the building use, sizes, jurisdiction, quantity, destination, and the scope you want priced. This independent sourcing service reads that note and asks factories for alternative quotations. It does not publish a street counter, because no public walk-in address is part of this service, and it does not pretend to be the brand you may have searched.
Use the form on this page. That is the channel that creates a procurement record. Do not rely on a social feed or a guessed phone number. If a drawing set is large, say so in the note and send files after the first reply.
Product format, footprint, eave height, layout, project location, code jurisdiction, wind speed, ground snow load, and seismic design category, quantity, destination, timing, and whether you want shell, delivered, installed, or turnkey pricing. A module count such as 12 units and a floor such as 20 ft by 8 ft belong here. Optional budget can be per unit or for the whole order. Also note design live load in psf if storage or equipment is heavier than an office floor, and the transport envelope if the road limits height.
The note is checked for missing scope. Factories are asked only after the comparison basis is clear. There is no published reply clock on this site. Compliance, price, and delivery remain unconfirmed until a named supplier answers the exact system.
Use Next and Previous to review the three groups; without JavaScript all required fields and the submit button remain visible. Supplier preference means the finish and service level you hope to see. It is not a scorecard of factories.
If the jurisdiction is still being confirmed, name the city and state and leave the code edition blank. A guessed wind speed is harder to unwind than an empty field. When you do have criteria, write them with units, such as 115 mph wind, 30 psf ground snow, and seismic design category C, and say they are project inputs rather than a catalog default. State whether the foundation interface is already designed, still with your engineer, or expected inside the quotation. That line changes which factories can respond without inventing a slab.
Phone and company help the desk reach a buyer, not a personal shopper. Use a work email that can receive drawing questions. The desk will not treat a missing budget as a reason to refuse the note, and it will not treat a round number as proof that a factory can meet it.